Nice call on the shutters Stig. I've been giving thought to buying plywood and pre=cutting everything I need. Predrill the holes to mount them as well. I have several windows and some of them 3 stories up, so it will take time to get them up. Having as much of the work done before hand will have to be a good thing IMO.