I ordered a steel workshop last year from Mayflower buildings last summer, and I have saving up $ to put in the concrete floor. The concrete pad is costing more than the entire cost (including shipping) of the building. But it was started on Thursday, and the concrete was poured on Saturday. It will be 40’x20’, with an 8’x8’ overhead door, and a steel regular door. It should look something like this when finished.
[IMG][/IMG]
This is what I’ve got so far...[IMG][/IMG]
[IMG][/IMG]
[IMG][/IMG]
The building is buried under all of the weeds in the background. I’ve already ran over a 5 gal. bucket containing all of the nuts and screws with the bushhog...now I’m trying to pick them up with a magnet. Oh what fun!