Quote Originally Posted by Sniper-T
^
That is correct.
An accuracy I take neither pride nor pleasure in. It is infuriating.

Were me, I'd take the hit of having to have a NG generator on premises as backup to a solar stack and tell NV Energy to go pound titanium shavings. At least with NG you HAVE to have at least the control at the meter, if not one or two at the generator...on YOUR side.