-
Originally Posted by
Sniper-T
^
That is correct.
An accuracy I take neither pride nor pleasure in. It is infuriating.
Were me, I'd take the hit of having to have a NG generator on premises as backup to a solar stack and tell NV Energy to go pound titanium shavings. At least with NG you HAVE to have at least the control at the meter, if not one or two at the generator...on YOUR side.
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules
Bookmarks