I've been slacking on the RV, as I have been doing some undercover prepping at Myrtle Beach, SC. Then I've had to make 2 of the wooden trucks I sell on the side, but now I have to put the nose to the grindstone...I've got three weeks to get it done. I bought 3 more 100Ah batteries, (total of 500Ah) 14 new lights, switches, battery cables, ect. Doing to be doing some serious demo and rebuilding next week. I've decided to keep the bathroom and kitchen where they were, saving time and materials. Getting rid of the couch, and putting the queen bed up front behind the driver seat. Gonna build a bench seat and table where the twin bed was in the rear, that can be made into a bed.