Today I finished installing all of the anchor bolts and installing the arch connector plates all around the base. Tomorrow I start bolting the 7 pieces together to make each 2 ft deep arch. Each arch, with all seven pieces use a total of 120 bolts, times 19 arches. Then there are around 112 bolts used to connect each arch to the next one, times 19 arches. Damn, that’s a lot of bolts. Here’s what I got so far.
[IMG][/IMG]

[IMG][/IMG]

[IMG][/IMG]

The second pic is all the pieces for the arches to make the building. The third pic is the 8x8 door and both end walls.